|
SERVICES:
|
SELECTED PROJECTS:
- DCCR Division H - Anacostia River Tunnel Project, Washington, DC:
- CSO 019 Drop Shaft; Design of block-outs for: (1) approach channel; (2) vent chamber; and (3) overflow structure openings in the shaft CIP liner
- M Street Drop Shaft: Design of (1) mudslab reinforement for the shaft invert slab; (2) working mat for construction of the invert slab top reinforcement; and (3) Block-outs for a large opening in the shaft CIP liner
- Alimak Elevator: Design of Alimak Elevator for labors at access shaft during construction of bored tunnel
- CSO 018 Drop Shaft: Design of Block-outs for the vortex and vent openings in the shaft CIP liner
- Verizon Concrete Duckbank: Design of 28" x 18" ducktbank support beam
- CSO 005 Drop Shaft;: Design of Block-outs for the vortex and vent openings in the shaft CIP liner
- Prestress Beam Block-out: Design of Block-out for prestressed precast beams
- CSO 007 Drop Shaft: Design of Block-outs for the vortex and vent openings in the shaft CIP liner